Facilities Plan

Red Hook Public Library 

FACILITIES PLAN  | Updated 4.2026

Part 1: Useful Life, Maintenance & Replacement Schedule 

LOCATION AGE USEFUL LIFE DESCRIPTION OF SERVICE DATE OF SERVICE CONTRACTOR NOTES 
Children’s Level and Addition  2011  Asbestos abatement June 2010 Robert Newkirk  Environmental Consulting and Services in Rhinebeck  
   Architect on project  Peter Sweeney  
   Renovation to basement and construction of addition on three floors 2011 Palombo Group Stanfordville, NY Contract included “Add Alternate One” – which is a renovation of the ground floor of the building to create a dedicated Children’s Library.    
Main Floor Middle Room  2016   Beams in ceiling sistered. Ceiling replaced at a lower level. HVAC vents installed.  Electric updated including USB plugs in addition nearest middle room. Wood floor refinished. Painted. New lighting. Shelving re-varnished    Above Standard Construction General Contractor 46 Broad ST West Hurley NY 12491  
Teen Room 2024  Repainted and refurnished teen room.  Internal  
Front room wood floor Original?  Sanding and refinishing 5/2021 Jobson Flooring 54 Gioia Drive, Cairo, NY 12413 518-929-7812 Were advised we will not get another sanding out of the same floor.  
Community Room, 2nd floor 2016  Gutting of existing kitchen, floor, ceiling, and southern wall, opening to closet.  Begun 1.18. 16, completed 5.15.16 Above Standard Construction General Contractor 46 Broad ST, West Hurley NY 12491 With advice from Khattar Elmassalemah, P.E. Praetorius and Conrad, P.C. PO Box 360 74 Main ST Saugerties, NY 12477 
 2025  Repainted  Internal  
Attic 1865  Cleaned, insulated, air-handlers for HVAC installed, attic fan.  2016 Above Standard Construction  
Front Porch Area  2024  Retrofitted with safety screens Safety screens updated and strengthened by Kevin Howe   2018   
Non-slip carpet added     
Railing newels repaired, new end barriers installed, several rotted boards replaced with 2020 painting project. 6/2020 Frank J. Ryan and Sons 295 1st ST, Troy, NY 12180  As part of trim painting project/ State construction grant of 2017. 
   Carpenter ants over entryway to porch treated in 2021 and monitored quarterly.  2021 Pestmaster Services 75 Lucas Ave., Kingston, NY 12401 845-340-9700  
  20-30 years TREX porch installed, updated railing height for compliance and replaced newels 2024 MCT Construction   
Yard   Termite removal under south side of porch in outdoor closet 4/2015 ABC Pest Control P.O. Box 3862, Kingston NY 12402 845-340-1224  
2014  Children’s Garden created    
  Lamposts  Light bulbs changed by handyman Kevin Howe  On timer Westinghouse Metal Halide 100 W ED17 Medium Base 10,000 hours Commercial Service from RH Electric 
Parking Lot and driveway 2025  Lot and driveway are paved & stormwater mitigation site added (will be added to all future construction projects)  Blacktop Maintenance Corp. Reseal every 3 years approximately 
Windows Main Old   Double hung with storms and working shutters    
Attic   Estimate obtained from Emily Majer for restoration of cupola windows. Possible Preserve NY grant 7/2022   
New, basement level 2011  Outer storm windows per NYSERDA for heat conservation and comfort  2015  Leave up year-round 
New, 2nd floor 2016  Community room window and addition windows are new. Remainder are old.    
Exterior Paint 2011  Part of addition construction project    
   Exterior trim repaired and painted as part of 2017 construction grant 2020 Frank J. Ryan and Sons 295 1st ST, Troy, NY 12180  2017 State construction grant (applied 2016) – changed scope of service b/c roof bids were too high. 
 2024  All stucco replaced and repainted  MCT Construction Corp.  
Septic                  Main 2011 as part of addition work Replaced as part of basement renovation and addition starting 5/2010   Pump every 3-4 years  Palombo Group of Stanfordville,  general contractor 
Major repairs fall of 2014 at which time it was discovered that some unusual “T” joints were impeding flow and also that the roof gutters were draining into the septic lines. An excavation was necessary to expose waste lines and reconfigure the waste and gutter drainage lines properly. Gutter lines diverted to daylight. Risers placed on existing tank for future access without excavation. At this time an odor emanating from the basement bathroom drain was addressed with a plug.   In April of 2015 the sump pump under the elevator was accessed. A Zoeller sump pump and piping valve, etc… was installed to tie in discharge of pump out through downspout discharge underneath concrete footpath behind building. A water alarm was installed.         2015          9V battery of water alarm under elevator must be changed every 6 months to a year.  Done by professionals only Red Hook Plumbing & Heating, Inc. One Dogwood ST Red Hook NY 12571 845.758.600 Bill, Patrick O’Farrell  Slated to be hooked up to village sewer system in 2018 at which time our only maintenance responsibility will be from the building to the tank. – delayed 
  Lines dug across parking lot north-south for Village sewer 4/2022  Septic system is closed. 
HVAC – main floor 2016-2022 Most ductwork was laid by MPower in 2016 with Community Room renovation project. At that time an air handler was placed in the attic, but the cooling until for outside was not purchased.  Ducts finished (brought from attic to the teen room and hooked up to existing duct work. Return finished. Cooling unit purchased and installed. Achieved with Dutchess County APG Infrastructure grant. (See binder)  Wired by DS Electric 2016    2022       Hudson Valley Air Control David Coates 150 Verbank Village RD Verbank, NY 12585 845-702-3981  1636 New York 9G Hyde Park, NY 12538  
Plumbing   Burst pipe behind children’s nook due to freezing, and mold remediation –  pipe replaced, walls and floor removed, mold removed. Utica National Insurance covered all but $500. New dehumidifier added in tween room closet and set to 45%. New humidity monitor at children’s desk – keep below 55-60%  Toilet on 3rd floor replaced after flood penetrated to 2nd floor mystery books area  Toilet on 3rd floor seal repaired after leak apparent around its base.  Toilet on 3rd floor seal repaired after leak again.  9/2018         3/2019   12/2021   2025 Red Hook Plumbing Adaptive Environmental Consulting – John Evans for protocol Westfair Restoration Services for mold removal Kevin Howe repaired bench, floor, and walls.  Red Hook Plumbing   Red Hook Plumbing  Brian Ackerman Red Hook Plumbing will turn water off in winter and on in spring.  
Electric                Main Floor  Old section   Some outlets have been retrofitted to be 3-prong but date is unknown.   Lighting is inadequate, especially in teen room.  Electrician checked all building outlets and replaced remaining two prong outlets in center 3rd floor office. Replaced one bad outlet in tween room closet under porch.      1/2019      DS Electric (Dave Stewart)  
Main Floor New Area 4/2016 Fiction room lighting re-wired, LED overhead lights added  Empower  
2nd Floor New area 4/2016 Part of 2016 renovation project – Community Room, Director’s Office  Empower  
Furnace              Main 2004 Oil    Service by Matthew from Kosco    3/2019 Yearly service plan contract with Kosco 1.800.755.6726  Furnace is in good shape, should last many more years, he would not replace it yet. It is a 2004 model and running at 85% efficiency. Parts are still readily available. Kosco Oil –  OGS contractor 13 S Prospect St Kingston, NY 12401 (845) 339-3455  
Oil Tank  Located in basement level easternmost closet Access under porch to right of center front walk     
Roof Octagon sections    Old building roof sections replaced, asbestos removed, new gutters installed  GAF Timberline AH shingles “Nantucket Morning” 7/2022 MCT AT Service INC, 1585 Central Park AV #55, Yonkers, NY 10710 $151, 840 Dutchess County APG Infrastructure grant up to $200,000.   Supervised by Khattar Elmassalemah, Praetorius and Conrad P.C. 
Addition 2011      
Gutters Octagonal sections    Must be cleaned by professionals  Last caused leaking in winter early 2015 when water leaked b/w octagon and addition through roof/gutters to second and first floors.  9/2015  Brothers that Just Do Gutters HV PO Box 137, Billings, NY 12510 Phone: 845-223-6111 Fax: 845-223-7444 Email: info@brothersgutters.com www.brothersgutters.com  Need covered gutters.  Metal framework around roof. 
Addition 2011 Cleaned yearly by handyman 2016 Kevin Howe   
Foundation 1865 Exterior basement around basement alcove parsed, sidewalk added around the “jut-out” to keep water away from pooling around the foundation there.  Specs by Khattar. 10/2021 Rondack , 5 Bingham Mills RD, Germantown, NY  12526   
  Wet wall detected in Tween Room. Currently investigating source. Possibly wetness in ground in outside closet under porch or damaged, split, window sills outside window.   No increase in moisture, monitoring. 4/2022     4/2026   
Chimney 1865 Fireplace not in use    

Part 2: Assessments & Projects 

SYSTEM DESCRIPTION OF SERVICES DATE CONTRACTOR/INSPECTOR NOTES 
Fire Safety Yearly inspection   Village of Red Hook Building and Zoning Last done 2/3/2017, 12/15/18, 2021, 2022, 2026 
Elevator  Water alarm battery replaced   Hydraulic tank repaired  Rollers repaired and water alarm battery replaced 12/6/17  Fall 2018  3/2019 Accessibility Solutions, Inc. PO Box 3122, Syracuse NY 13220 518.731.6192  
Water alarm 4/2015  On floor under elevator. Will sound if water rises in the shaft. (Sump pump is under elevator) Takes 9V battery, changed with each inspection. Installed by Red Hook Plumbing following flood beneath elevator 
3nd floor west room   Inadequate lighting. Closet walls and ceiling are crumbling. Floor beams may need to be sistered before books moved in and room used for public. Carpet must be removed. Electric is inadequate and 2-pronged. The front room on the 2nd floor is currently needed for staff work, everyday storage of office supplies, records, and program materials.  Update: 3-pronged outlets added 1/2019. But no replacement of wires inside walls was done.   
Assistant Director Office There is no heat or A/C. Inadequate lighting. Carpet to be removed.     
3rd floor Bathroom  Tub to be removed, fixtures updated. Possible utility sink, shelves.  Update: new toilet 3/2019 following leak into main floor mystery section. Ceiling fixed with access panel.   
Main Floor Front room, foyer, teen room A/C, floors, lighting, rearranging of furniture, increased storage, SAM computers need more privacy and space. Middle room needs painting.    
Teen room Updated and repainted. Inadequate electric outlets. 2024 Plexiglass installed over lower alcove windows 1/2019 for safety after several panes broke.  
Staircase Strip old paint and retread    

Part 3: Energy Efficiency 

LOCATION DESCRIPTION DATE OF COMPLETION CONTRACTOR 
Energy Audit NYSERDA Flex Tech Audit February 2013 L&S Energy Services, Inc. 58 Clifton Country RD Clifton Park NY 12065 
 NYSERDA Audit April 2024  
Heat Attic insulation – foam   April 2016 Above Standard Construction General Contractor 46 Broad ST West Hurley NY 12491 
Future – geothermal pump?   
 Thermostats – programmable Main floor unit replaced ~2020 2nd floor unit installed 2016  
Lighting Replaced all interior lighting with LED Ongoing by attrition  ongoing 
  January 2020 – Lighting upgrade by Lime Energy for energy efficiency  
Windows Audit recommends exterior storm windows – not compatible with historic building’s character on main octagon section. New windows in Children’s Library have exterior storm windows. Put up each fall by handyman Kevin Howe 10 Broadview LA Red Hook NY 12571 (845) 229-2202 kknowhowe@aol.com 
A/C Functioning fine A/C installed 2nd floor three rooms  only 4/2016 Above Standard Construction 
Attic Insulated 4/2016 Above Standard Construction 

Part 4: Prioritized Project List 

TOPIC TIMING DESCRIPTION ESTIMATED COST 
CHILDREN’S GARDEN Spring/Summer 2026 Update children’s garden   
WATER EFFICIENT FAUCETS Summer 2026 Update sink and bathroom faucets to include flow reducers, aerators or similar water efficiency devices with WaterSense branding where possible and ensure ADA standards are met.   
HUMIDITY CONTROL Summer 2026 Assess options to control humidity throughout the building. Explore temporary solutions in advance of heat pump transition.   
ELECTRIC REAR DOOR Summer 2026 Install automated electric door at rear of building.  
EXIT SIGN Summer 2026 Install new exit sign over main entrance.   
THIRD FLOOR OFFICE HEATING AND LIGHT EOY 2026 Fix light in assistant director’s office. Connect to existing HVAC system.  
THIRD FLOOR OFFICE CEILING REPAIR 2027 Sister ceiling and repair plaster or replace with drywall and paint.   
STORAGE  2027 On property storage explored and unfeasible. Assess off property storage options.  
HANDRAILS AND EDGING 2027-2028 Install handrails and edging along the building’s accessible ramp from the parking lot to the rear entrance. Increase landing size if required.   
ENERGY EFFICIENT APPLICANCES As needed Replace all appliances when necessary with ENERGY STAR rated models  
ELECTRIC OUTLETS As needed Rewire building to add more outlets, usb connections.    
ELECTRIC HEAT CONVERSION End of life of furnace Replace oil furnace with electric-based heat source such as air-source or geothermal heat pump. Include humidity control in review of options.  
FLOOR REPLACMENT As needed Replace wood floors throughout, were advised that at least first floor is end of life and cannot just be sanded and refinished again.  
LAMPOST AND OUTDOOR LIGHTING As needed Review functionality and brightness of existing lamposts and outdoor lighting sources, change to LED instead of halogen if rewiring is required.  
THIRD FLOOR OFFICE AND BATHROOM RENOVATIONS Long term Replace carpet. Improve electric outlets. Remove tub and reconfigure space. Assess possibility of ADA compliance.  