Red Hook Public Library
FACILITIES PLAN | Updated 4.2026
Part 1: Useful Life, Maintenance & Replacement Schedule
| LOCATION | AGE | USEFUL LIFE | DESCRIPTION OF SERVICE | DATE OF SERVICE | CONTRACTOR | NOTES |
| Children’s Level and Addition | 2011 | Asbestos abatement | June 2010 | Robert Newkirk Environmental Consulting and Services in Rhinebeck | ||
| Architect on project | Peter Sweeney | |||||
| Renovation to basement and construction of addition on three floors | 2011 | Palombo Group Stanfordville, NY Contract included “Add Alternate One” – which is a renovation of the ground floor of the building to create a dedicated Children’s Library. | ||||
| Main Floor Middle Room | 2016 | Beams in ceiling sistered. Ceiling replaced at a lower level. HVAC vents installed. Electric updated including USB plugs in addition nearest middle room. Wood floor refinished. Painted. New lighting. Shelving re-varnished | Above Standard Construction General Contractor 46 Broad ST West Hurley NY 12491 | |||
| Teen Room | 2024 | Repainted and refurnished teen room. | Internal | |||
| Front room wood floor | Original? | Sanding and refinishing | 5/2021 | Jobson Flooring 54 Gioia Drive, Cairo, NY 12413 518-929-7812 | Were advised we will not get another sanding out of the same floor. | |
| Community Room, 2nd floor | 2016 | Gutting of existing kitchen, floor, ceiling, and southern wall, opening to closet. | Begun 1.18. 16, completed 5.15.16 | Above Standard Construction General Contractor 46 Broad ST, West Hurley NY 12491 | With advice from Khattar Elmassalemah, P.E. Praetorius and Conrad, P.C. PO Box 360 74 Main ST Saugerties, NY 12477 | |
| 2025 | Repainted | Internal | ||||
| Attic | 1865 | Cleaned, insulated, air-handlers for HVAC installed, attic fan. | 2016 | Above Standard Construction | ||
| Front Porch Area | 2024 | Retrofitted with safety screens Safety screens updated and strengthened by Kevin Howe | 2018 | |||
| Non-slip carpet added | ||||||
| Railing newels repaired, new end barriers installed, several rotted boards replaced with 2020 painting project. | 6/2020 | Frank J. Ryan and Sons 295 1st ST, Troy, NY 12180 | As part of trim painting project/ State construction grant of 2017. | |||
| Carpenter ants over entryway to porch treated in 2021 and monitored quarterly. | 2021 | Pestmaster Services 75 Lucas Ave., Kingston, NY 12401 845-340-9700 | ||||
| 20-30 years | TREX porch installed, updated railing height for compliance and replaced newels | 2024 | MCT Construction | |||
| Yard | Termite removal under south side of porch in outdoor closet | 4/2015 | ABC Pest Control P.O. Box 3862, Kingston NY 12402 845-340-1224 | |||
| 2014 | Children’s Garden created | |||||
| Lamposts | Light bulbs changed by handyman Kevin Howe On timer | Westinghouse Metal Halide 100 W ED17 Medium Base 10,000 hours Commercial Service from RH Electric | ||||
| Parking Lot and driveway | 2025 | Lot and driveway are paved & stormwater mitigation site added (will be added to all future construction projects) | Blacktop Maintenance Corp. | Reseal every 3 years approximately | ||
| Windows Main | Old | Double hung with storms and working shutters | ||||
| Attic | Estimate obtained from Emily Majer for restoration of cupola windows. Possible Preserve NY grant | 7/2022 | ||||
| New, basement level | 2011 | Outer storm windows per NYSERDA for heat conservation and comfort | 2015 | Leave up year-round | ||
| New, 2nd floor | 2016 | Community room window and addition windows are new. Remainder are old. | ||||
| Exterior Paint | 2011 | Part of addition construction project | ||||
| Exterior trim repaired and painted as part of 2017 construction grant | 2020 | Frank J. Ryan and Sons 295 1st ST, Troy, NY 12180 | 2017 State construction grant (applied 2016) – changed scope of service b/c roof bids were too high. | |||
| 2024 | All stucco replaced and repainted | MCT Construction Corp. |
| Septic Main | 2011 as part of addition work | Replaced as part of basement renovation and addition starting 5/2010 | Pump every 3-4 years | Palombo Group of Stanfordville, general contractor | |
| Major repairs fall of 2014 at which time it was discovered that some unusual “T” joints were impeding flow and also that the roof gutters were draining into the septic lines. An excavation was necessary to expose waste lines and reconfigure the waste and gutter drainage lines properly. Gutter lines diverted to daylight. Risers placed on existing tank for future access without excavation. At this time an odor emanating from the basement bathroom drain was addressed with a plug. In April of 2015 the sump pump under the elevator was accessed. A Zoeller sump pump and piping valve, etc… was installed to tie in discharge of pump out through downspout discharge underneath concrete footpath behind building. A water alarm was installed. | 2015 | 9V battery of water alarm under elevator must be changed every 6 months to a year. Done by professionals only | Red Hook Plumbing & Heating, Inc. One Dogwood ST Red Hook NY 12571 845.758.600 Bill, Patrick O’Farrell Slated to be hooked up to village sewer system in 2018 at which time our only maintenance responsibility will be from the building to the tank. – delayed | ||
| Lines dug across parking lot north-south for Village sewer | 4/2022 | Septic system is closed. | |||
| HVAC – main floor | 2016-2022 | Most ductwork was laid by MPower in 2016 with Community Room renovation project. At that time an air handler was placed in the attic, but the cooling until for outside was not purchased. Ducts finished (brought from attic to the teen room and hooked up to existing duct work. Return finished. Cooling unit purchased and installed. Achieved with Dutchess County APG Infrastructure grant. (See binder) Wired by DS Electric | 2016 2022 | Hudson Valley Air Control David Coates 150 Verbank Village RD Verbank, NY 12585 845-702-3981 1636 New York 9G Hyde Park, NY 12538 | |
| Plumbing | Burst pipe behind children’s nook due to freezing, and mold remediation – pipe replaced, walls and floor removed, mold removed. Utica National Insurance covered all but $500. New dehumidifier added in tween room closet and set to 45%. New humidity monitor at children’s desk – keep below 55-60% Toilet on 3rd floor replaced after flood penetrated to 2nd floor mystery books area Toilet on 3rd floor seal repaired after leak apparent around its base. Toilet on 3rd floor seal repaired after leak again. | 9/2018 3/2019 12/2021 2025 | Red Hook Plumbing Adaptive Environmental Consulting – John Evans for protocol Westfair Restoration Services for mold removal Kevin Howe repaired bench, floor, and walls. Red Hook Plumbing Red Hook Plumbing Brian Ackerman | Red Hook Plumbing will turn water off in winter and on in spring. | |
| Electric Main Floor Old section | Some outlets have been retrofitted to be 3-prong but date is unknown. Lighting is inadequate, especially in teen room. Electrician checked all building outlets and replaced remaining two prong outlets in center 3rd floor office. Replaced one bad outlet in tween room closet under porch. | 1/2019 | DS Electric (Dave Stewart) | ||
| Main Floor New Area | 4/2016 | Fiction room lighting re-wired, LED overhead lights added | Empower | ||
| 2nd Floor New area | 4/2016 | Part of 2016 renovation project – Community Room, Director’s Office | Empower | ||
| Furnace Main | 2004 | Oil Service by Matthew from Kosco | 3/2019 | Yearly service plan contract with Kosco 1.800.755.6726 Furnace is in good shape, should last many more years, he would not replace it yet. It is a 2004 model and running at 85% efficiency. Parts are still readily available. | Kosco Oil – OGS contractor 13 S Prospect St Kingston, NY 12401 (845) 339-3455 |
| Oil Tank | Located in basement level easternmost closet Access under porch to right of center front walk | ||||
| Roof Octagon sections | Old building roof sections replaced, asbestos removed, new gutters installed GAF Timberline AH shingles “Nantucket Morning” | 7/2022 | MCT AT Service INC, 1585 Central Park AV #55, Yonkers, NY 10710 | $151, 840 Dutchess County APG Infrastructure grant up to $200,000. Supervised by Khattar Elmassalemah, Praetorius and Conrad P.C. | |
| Addition | 2011 | ||||
| Gutters Octagonal sections | Must be cleaned by professionals Last caused leaking in winter early 2015 when water leaked b/w octagon and addition through roof/gutters to second and first floors. | 9/2015 | Brothers that Just Do Gutters HV PO Box 137, Billings, NY 12510 Phone: 845-223-6111 Fax: 845-223-7444 Email: info@brothersgutters.com www.brothersgutters.com | Need covered gutters. Metal framework around roof. | |
| Addition | 2011 | Cleaned yearly by handyman | 2016 | Kevin Howe | |
| Foundation | 1865 | Exterior basement around basement alcove parsed, sidewalk added around the “jut-out” to keep water away from pooling around the foundation there. Specs by Khattar. | 10/2021 | Rondack , 5 Bingham Mills RD, Germantown, NY 12526 | |
| Wet wall detected in Tween Room. Currently investigating source. Possibly wetness in ground in outside closet under porch or damaged, split, window sills outside window. No increase in moisture, monitoring. | 4/2022 4/2026 | ||||
| Chimney | 1865 | Fireplace not in use |
Part 2: Assessments & Projects
| SYSTEM | DESCRIPTION OF SERVICES | DATE | CONTRACTOR/INSPECTOR | NOTES | |
| Fire Safety | Yearly inspection | Village of Red Hook Building and Zoning | Last done 2/3/2017, 12/15/18, 2021, 2022, 2026 | ||
| Elevator | Water alarm battery replaced Hydraulic tank repaired Rollers repaired and water alarm battery replaced | 12/6/17 Fall 2018 3/2019 | Accessibility Solutions, Inc. PO Box 3122, Syracuse NY 13220 518.731.6192 | ||
| Water alarm | 4/2015 | On floor under elevator. Will sound if water rises in the shaft. (Sump pump is under elevator) Takes 9V battery, changed with each inspection. | Installed by Red Hook Plumbing following flood beneath elevator | ||
| 3nd floor west room | Inadequate lighting. Closet walls and ceiling are crumbling. Floor beams may need to be sistered before books moved in and room used for public. Carpet must be removed. Electric is inadequate and 2-pronged. The front room on the 2nd floor is currently needed for staff work, everyday storage of office supplies, records, and program materials. | Update: 3-pronged outlets added 1/2019. But no replacement of wires inside walls was done. | |||
| Assistant Director Office | There is no heat or A/C. Inadequate lighting. Carpet to be removed. | ||||
| 3rd floor Bathroom | Tub to be removed, fixtures updated. Possible utility sink, shelves. | Update: new toilet 3/2019 following leak into main floor mystery section. Ceiling fixed with access panel. | |||
| Main Floor Front room, foyer, teen room | A/C, floors, lighting, rearranging of furniture, increased storage, SAM computers need more privacy and space. Middle room needs painting. | ||||
| Teen room | Updated and repainted. Inadequate electric outlets. | 2024 | Plexiglass installed over lower alcove windows 1/2019 for safety after several panes broke. | ||
| Staircase | Strip old paint and retread | ||||
Part 3: Energy Efficiency
| LOCATION | DESCRIPTION | DATE OF COMPLETION | CONTRACTOR | |
| Energy Audit | NYSERDA Flex Tech Audit | February 2013 | L&S Energy Services, Inc. 58 Clifton Country RD Clifton Park NY 12065 | |
| NYSERDA Audit | April 2024 | |||
| Heat | Attic insulation – foam | April 2016 | Above Standard Construction General Contractor 46 Broad ST West Hurley NY 12491 | |
| Future – geothermal pump? | ||||
| Thermostats – programmable | Main floor unit replaced ~2020 2nd floor unit installed 2016 | |||
| Lighting | Replaced all interior lighting with LED | Ongoing by attrition | ongoing | |
| January 2020 – Lighting upgrade by Lime Energy for energy efficiency | ||||
| Windows | Audit recommends exterior storm windows – not compatible with historic building’s character on main octagon section. | New windows in Children’s Library have exterior storm windows. Put up each fall by handyman | Kevin Howe 10 Broadview LA Red Hook NY 12571 (845) 229-2202 kknowhowe@aol.com | |
| A/C | Functioning fine | A/C installed 2nd floor three rooms only 4/2016 | Above Standard Construction | |
| Attic | Insulated | 4/2016 | Above Standard Construction | |
Part 4: Prioritized Project List
| TOPIC | TIMING | DESCRIPTION | ESTIMATED COST |
| CHILDREN’S GARDEN | Spring/Summer 2026 | Update children’s garden | |
| WATER EFFICIENT FAUCETS | Summer 2026 | Update sink and bathroom faucets to include flow reducers, aerators or similar water efficiency devices with WaterSense branding where possible and ensure ADA standards are met. | |
| HUMIDITY CONTROL | Summer 2026 | Assess options to control humidity throughout the building. Explore temporary solutions in advance of heat pump transition. | |
| ELECTRIC REAR DOOR | Summer 2026 | Install automated electric door at rear of building. | |
| EXIT SIGN | Summer 2026 | Install new exit sign over main entrance. | |
| THIRD FLOOR OFFICE HEATING AND LIGHT | EOY 2026 | Fix light in assistant director’s office. Connect to existing HVAC system. | |
| THIRD FLOOR OFFICE CEILING REPAIR | 2027 | Sister ceiling and repair plaster or replace with drywall and paint. | |
| STORAGE | 2027 | On property storage explored and unfeasible. Assess off property storage options. | |
| HANDRAILS AND EDGING | 2027-2028 | Install handrails and edging along the building’s accessible ramp from the parking lot to the rear entrance. Increase landing size if required. | |
| ENERGY EFFICIENT APPLICANCES | As needed | Replace all appliances when necessary with ENERGY STAR rated models | |
| ELECTRIC OUTLETS | As needed | Rewire building to add more outlets, usb connections. | |
| ELECTRIC HEAT CONVERSION | End of life of furnace | Replace oil furnace with electric-based heat source such as air-source or geothermal heat pump. Include humidity control in review of options. | |
| FLOOR REPLACMENT | As needed | Replace wood floors throughout, were advised that at least first floor is end of life and cannot just be sanded and refinished again. | |
| LAMPOST AND OUTDOOR LIGHTING | As needed | Review functionality and brightness of existing lamposts and outdoor lighting sources, change to LED instead of halogen if rewiring is required. | |
| THIRD FLOOR OFFICE AND BATHROOM RENOVATIONS | Long term | Replace carpet. Improve electric outlets. Remove tub and reconfigure space. Assess possibility of ADA compliance. |